Paint with thermal insulation and heat shielding function guarantee.
If the reduction in air conditioning energy at the factory due to the introduction of Danest is less than 10%, we will guarantee the material costs of Danest used during construction.
【Guarantee Details】 If the reduction in air conditioning energy at the factory due to the introduction of DanNest is less than 10%, we guarantee the material costs of DanNest used during installation (to be paid from our insurance). *Patent pending for "guaranteed paint." 【Energy Calculation Conditions】 The reduction in air conditioning energy will be calculated under the following conditions. *Energy refers to data on the usage of electricity, gas, etc. (1) Data from summer (June, July, August, September) and winter (December, January, February, March) will be considered. (2) For data from one year after installation, the reduction amount will be calculated by comparing it to the same month of the previous year, and the eligibility for the guarantee will be determined based on the average reduction amount over the year. (3) This applies to factories and stores of companies, and only energy related to air conditioning usage will be considered. *General residential properties are excluded. (4) Energy related to lighting, machinery, and other specifications is not included in the calculations. *For more details, please refer to the PDF document or feel free to contact us.
- Company:SG化学 本社
- Price:Other